Announcements & News
Serena Garden Stonework Receives 2022 Pinnacle Award
February 1, 2023
The Serena Williams Garden at the Nike World HQ features curved stone walls, cubic benches, intricately set pavers, and a 7.5' tall and 60' long monument honoring the tennis legend. The garden’s design was inspired by the game of tennis and incorporates the movement of Serena’s stroke in the curvature of the walls and the shape of the lettering in her name.
95 State Street Stonework Receives 2022 Pinnacle Award
February 1, 2023
The 95 State Street lobby features 220’ long marble walls that stretch over 40’ high and maintain a continual linear veining pattern across all courses. Before a single stone was fabricated, it had already been assigned a specific location on the wall to ensure vein alignment over both concave and convex curvatures and recessed walls...
National Music Centre of Canada
Josephine Minutillo | Architectural Record
November 7, 2016
The 181,000 SF National Music Centre of Canada opened this summer. Working with CANA Construction, KEPCO+ provided Design-Assist services for this unique project, including framing design, modulation studies, glaze and tile development analysis, and facade engineering.
Extensive stonework creates a peaceful setting for a temple in Indianapolis, IN
Sarah Garafalo | Stone World
September 1, 2016
The owner and design team sought to express timelessness and monumentality as a reflection of the special nature of this religious building,” said Randy Knight, associate principal at MHTN Architects...
Nuskin Desk Selected for Special Pinnacle Award of Merit
October 1, 2014
The Nu Skin Innovation Center's marble desk was so impressive to the MIA Pinnacle Award judges that they created a unique award to recognize it - the Special Pinnacle Award of Merit for Architectural Element. The massive, one-of-a-kind marble desk is 26' long and 5' wide at its thickest point.
Stone Installation Planning Leads to Saving Money
Jason Kamery | Stone World Magazine
August 1, 2014
"Some of the project’s greatest accomplishments were achieved during the pre-construction phase. The team identified several details that could be altered to enhance aesthetics, while at the same time improving the schedule, performance and budget..."